Works largely involved demolition and replacement of existing bridges over road and water, widening of existing bridges, subsoil drainage, traffic barriers, road furniture, ITS, electrical and lighting.
One of the busiest sections of the Pacific Motorway on the Gold Coast, CMC was engaged (in joint venture with Downer) to widen the north and southbound lanes from four to six between Worongary (Exit 77) and Mudgeeraba (Exit 79) interchanges – a total length of two kilometres; extend and upgrade the Exit 77 and Exit 79 on and off-ramps; widen existing bridges; and widen the southbound motorway between Mudgeeraba (Exit 79) and Robina interchanges (Exit 82) – a total length of three kilometres.
Works largely involved demolition and replacement of existing bridges over road and water, widening of existing bridges, subsoil drainage, traffic barriers, road furniture, ITS, electrical and lighting.