St Mary’s Bridge Replacement

Scope

The project involved the replacement of an existing timber bridge with a precast concrete ‘Humedeck’ bridge along St Marys Road, crossing Benarige Creek.

Works included construction of a sidetrack, demolition, disposal and removal of the existing structure, bulk earthworks, construction/ reconstruction of flexible pavement and concrete roadway approaches, installation only of piling works, supply and installation of the precast concrete bridge including abutments, construction of rock-filled gabions and guardrail installation.

The short program made coordination with the major suppliers to this project paramount.

Major Quantities

  • 200m3 earthworks cut to fill
  • 220m3 of rock
  • 168m3 of gabion and wire mattress abutment protection
  • 180m3 of concrete in the floodway
St Mary's Bridge Replacement
700K
Fraser Coast Regional Council
March 2021 - April 2021