CMC’s scope of work included:
- Resurfacing between Southport–Nerang Road and Cotlew Street, including the Cotlew Street roundabout
- Modifications to centre medians for the removal of existing turn lanes and the installation of new turf and stencilled concrete
- Removal of several obstructing trees along the route to reduce potential roadside hazards to motorists
- Installation of additional streetlights to improve night time visibility
- Replacement of gully pits to improve road surface drainage
- Replacement of damaged guardrail